P R I C E L I S T
|
1.Washing (machine) of solid floorings /marble, mosaic, granite, terracotta, facings, linoleum, parquet and etc./ |
1,40 BGN per square meter |
|
|
|
|
2.Washing(cleaning)of wall linings /price-depends on the type and condition of the lining/ |
|
|
3. Sealing (polishing) of solid floorings /laying of preparation which polishes and protects the flooring/ |
1,55 BGN per square meter |
|
|
|
|
4.Crystallization of marble floors /recovering of the initial gloss of the marble/ |
3,00 BGN per square meter |
|
5. Polishing (machine)treatment /sealing and crystallization/
|
1,00 BGN per square meter |
|
6.Impregnation of paved floors and floorings /price- depends on the type and condition of the floors/ |
|
|
7. Exquisitely grinding of solid floorings /price – depends on the type and condition of the flooring/ |
|
|
|
|
|
8. Machine washing, rinsing and drying of soft floorings /carpets, strips of carpet, upholsteris and etc./ |
1,40 BGN per square meter |
|
9. Machine washing of upholstered furniture /1item = min 1 square meter/ |
1,95 BGN per square meter |
|
10. Washing of windows and glass-cases /cleaning of woodwork and blinds – by negotiation/ |
0,95 BGN per square meter one-sided |
|
11. Services which are executed on big heights by alpine manner /cleaning of facades, glasses, advertisements, ornaments, and etc; painting; mountings/
|
|
|
12. Daily maintenance of cleanliness /price- depends on the area, regularity and the specificity of the building/ |
|
13. Executing of unspecific job |
6 BGN per hour for each worker |
||||||||||
|
|
|||||||||||
| -days off | |||||||||||
| -manual labour | |||||||||||
| -travelling expenses | |||||||||||
| - 100% rise for: -specialized treatment | |||||||||||
| -cleaning after overhaul | |||||||||||
| -unsuitable conditions of work | |||||||||||
| -height above 3 meters | |||||||||||
| -holidays | |||||||||||
| *Minimum price for one order | 60,00 BGN | ||||||||||
| *Unprovided parking space | 2 BGN / hour / car | ||||||||||
| *Lifting and laying down of cleaning techniques without an elevator | 1 BGN / per floor | ||||||||||
| *Transportation fee for sites outside the ring-road | 0,60 BGN / km. | ||||||||||
*The above prices are without VAT.